| Brand Name: | Jinke |
| Model Number: | JK810 |
| MOQ: | 1 Unit |
| Price: | Negotiable |
| Delivery Time: | 35-55 Working Days |
| Payment Terms: | T/T,L/C |
Dust is usually the first thing a quarry neighbor complains about, and the first thing an inspector writes down. The JK810 can be supplied with a dry cyclone collector that pulls the return air off the hole, spins the cuttings out and drops them into a bin you can empty with the machine, without a water tank on site. On a dry bench the plume that normally hangs over the pattern stays inside the collector.
Where the site has water and the local rules prefer suppression, the same rig runs water injection at the hammer head instead. The change is a set of fittings and a tank, not a different machine, which matters when one contractor drills in two districts with different permits.
Underneath the dust package it is a standard JK810: a 90-140 mm DTH hammer on a 6,200 kg crawler chassis, 60 m of depth, an onboard compressor and hydraulic rod handling. The air that clears the hole is the same air that carries the cuttings, so the collector is sized to the compressor rather than added as an afterthought.
Key Features| Parameter | Specification |
|---|---|
| Model Series | JK810 Series |
| Drilling Method | Down-the-hole (DTH) hammer |
| Hole Diameter | 90-140 mm |
| Max Drilling Depth | 60 m |
| Dust Control | Dry cyclone collector with discharge bin |
| Alternative Dust Mode | Water injection at the hammer head |
| Air Supply | Onboard diesel-driven compressor |
| Control Mode | Full hydraulic, pilot joystick |
| Gradeability | 30 Degree |
| Transport Weight | 6,200 kg |
This configuration is aimed at quarries and open pits in dry regions, and at operations working close to villages, roads or greenhouses where visible dust carries a cost. Aggregate plants, cement limestone quarries and dimension stone operations all run it on bench patterns of 60 m or less.
It also fits civil contracts where the driller moves between urban edges and remote pits: the dry collector handles the sensitive location, the water mode handles the site where a bowser is already on the books. Contractors drilling blast holes for road cuts and site preparation use the same machine through the whole project.
Packaging, Delivery and WarrantyThe collector, bin and ducting are shipped as a matched set with the rig, crated separately from the chassis so nothing is crushed in transit. Hydraulic and air lines are capped and the steel is treated for sea freight; loading is by flat rack or RoRo.
Delivery runs 35 to 55 working days after deposit. The machine is covered by a 12 month or 2,000 hour warranty, with CE documentation and ISO 9001 records supplied for import. Collector filters, bin seals and injection fittings are kept as stock spares for export customers.