| Brand Name: | SHACMAN |
| Model Number: | L3000 4x2 Combo |
| MOQ: | 1 Unit |
| Price: | USD 26,500 - 31,200 / Unit |
| Delivery Time: | 35-55days |
| Payment Terms: | T/T,L/C at sight |
Fleet owners keep asking the same question in different words: do I buy two trucks or one that does both. The honest answer is that a combination wrecker is a compromise, and whether the compromise pays depends on your job mix.
This L3000 4x2 carries a 5 ton telescopic boom at the rear and a 5800mm flat deck behind the cab. The deck loads cars that still roll. The boom lifts casualties that do not. On a shift with four calls, three drive-on and one front-end damage, you finish with one vehicle instead of calling a second unit.
| Item | Specification |
|---|---|
| Chassis | SHACMAN L3000 4x2, 4700mm wheelbase |
| Engine | 210HP diesel, Euro 2 |
| Boom | 5 ton telescopic, 3200mm extended, 360 degree slewing |
| Deck | 5800 x 2300mm, 6 ton payload, 8 degree tilt |
| Winch | 8 ton double winch, front and rear drums |
| Outriggers | Two hydraulic legs, 2200mm spread |
| Cab | L3000 flat cab, day cab, left hand drive |
| GVW | 16000kg |
What you gain: no second dispatch, no waiting for a rotator, and one driver instead of two on mixed call-outs.
Accident recovery where the front suspension is collapsed. Vehicles nose-in against a barrier. Cars in a ditch with the rear wheels buried. In all three, a deck cannot load until someone lifts the nose, and that is exactly what the boom does before the winch takes over.
The boom is a two-section box section in Q460, welded in a jig and stress relieved before painting, with a single 5 ton cylinder inside the first section. Slew is a worm gear drive with a manual lock pin. The deck frame and boom frame are separate structures bolted to the chassis through a common sub-frame, so a deck repair does not disturb boom alignment.
RoRo or break bulk, since the combination layout does not containerise. The boom is locked, braced and shrink wrapped; outrigger rams are retracted and pinned. Lead time 35 to 45 working days.
Can I use both at once? No. Deck loading and boom lifting are separate operations, with interlocks on the valve block.
Is the deck tilt hydraulic? Yes, 8 degrees, single cylinder with a check valve.
Can the boom be upgraded to 8 ton? Only on the 4700mm chassis with the heavy sub-frame option; ask for the drawing before ordering.