| Brand Name: | Jinke |
| Model Number: | JK810 |
| MOQ: | 1 Unit |
| Price: | Negotiable |
| Delivery Time: | 35-55 Working Days |
| Payment Terms: | T/T,L/C |
The rod loader is the part of the JK810 that changes how a crew is paid for. A 3 m rod weighs more than one man should lift forty times a shift, so on most small rigs the driller waits at the panel while somebody else shoulders the steel. Here the hydraulic arm takes the rod off the rack, swings it into the mast line and feeds it while the operator keeps his hands on the levers. Twenty joints down a 60 m hole, that is twenty waits that no longer exist.
Everything else that usually costs time on a bench has been put on the same chassis. The compressor is mounted on the rig, so there is no second truck to book and no air hose to drag through the muck. Mast levelling, travel and feed are all hydraulic, which means one man can move the machine, set the mast and collar the hole without calling anyone over.
At 6,200 kg on 350 mm steel tracks the JK810 is still light enough to load on a standard flatbed between jobs, and it will climb a 30 degree ramp into the pit under its own power. It is built for contractors running short patterns in several small quarries rather than one deep pit with a fixed bench.
Key Features| Parameter | Specification |
|---|---|
| Model Series | JK810 Series |
| Drilling Method | Down-the-hole (DTH) hammer |
| Hole Diameter | 90-140 mm |
| Max Drilling Depth | 60 m |
| Rod Handling | Automatic hydraulic loader, 3 m rods |
| Air Supply | Onboard diesel-driven compressor |
| Control Mode | Full hydraulic, pilot joystick |
| Track Width | 350 mm steel grouser |
| Gradeability | 30 Degree |
| Transport Weight | 6,200 kg |
The JK810 suits quarry and open-pit blast hole work where the pattern is small and the moves are frequent: aggregate pits supplying ready-mix plants, stone quarries with two or three benches, and contractors who drill for several owners in the same district. Hole sizes from 90 mm to 140 mm cover both pre-split lines and normal production holes, so the same rig stays busy when the pattern changes.
Because the rod loader removes the second man from the collar, the rig also works well where labour is expensive or hard to keep. One operator can drill, move and set up through a shift, and the machine can be trailered between sites by a driver who is not part of the drilling crew.
Packaging, Delivery and WarrantyEach unit leaves the works with the hydraulic system flushed and filled, the compressor serviced, and unpainted steel treated against sea air. Loading is by flat rack or RoRo depending on the destination port, with the mast folded and the rod rack strapped separately.
Production takes 35 to 55 working days after deposit. The rig carries a 12 month or 2,000 hour warranty, backed by a CE declaration and ISO 9001 production records. Wear parts, seals and rod loader components are held in stock for export orders, and we can quote a two-year spare kit with the machine.