| Brand Name: | SHACMAN |
| Model Number: | L3000 4x2 RHD Flatbed |
| MOQ: | 1 Unit |
| Price: | USD 22,700 - 26,400 / Unit |
| Delivery Time: | 35-55 working days after deposit |
| Payment Terms: | T/T,L/C at sight |
Export spec is not a marketing label. It is a set of decisions made at the factory: mechanical injection pump instead of common rail, no DPF, no SCR, no AdBlue tank, wider radiator core, and a fuel pre-filter with a water separator that a driver can drain at the roadside with a 12mm spanner.
This L3000 4x2 is right hand drive, 210HP, Euro 2, and it will run on the diesel sold along the Mombasa to Kampala corridor without arguing. That is the brief we build to, and it is why the wiring harness is simplified to three fuseboxes rather than seven.
| Item | Specification |
|---|---|
| Chassis | SHACMAN L3000 4x2 RHD, 4500mm wheelbase |
| Engine | 210HP diesel, Euro 2, mechanical injection pump |
| Deck | 6000 x 2300mm, 6 ton payload, 8 degree tilt |
| Winch | 6 ton hydraulic, 25m rope |
| Steering | Right hand drive, hydraulic power assisted |
| Fuel system | Mechanical pump, water separator pre-filter, 200L tank |
| Cab | L3000 flat cab, day cab, RHD |
| GVW | 16000kg |
Right hand drive changes the steering box, drag link, brake valve position, clutch piping and the whole dash layout. It also changes which parts a workshop in Dar es Salaam can actually find. We ship a documented spare parts list with SHACMAN part numbers matched to cross references, plus a first year kit: filters, belts, brake chambers, a clutch plate, and one steering drag link.
RoRo is the practical route for most African and Southeast Asian ports. We supply commercial invoice, packing list, certificate of origin, and a full technical file in English, including hydraulic schematic, wiring diagram and a torque table. Certificates for your market (for example SONCAP or PVoC) can be arranged if you tell us the destination before production starts.
Is left hand drive still available? Yes, same deck and same price, but the RHD build has a 5 to 7 day longer lead time because of steering component supply.
Can the deck take a 3 ton forklift? The deck is rated 6 ton distributed. Point loads from forklift wheels need a steel overlay plate; specify it when ordering.
What about the air conditioning? Standard, R134a, with a condenser sized for 45 degree ambient.